Stop Turbines Ruining Our Lovely Landscape
Docking, Fring
and Bircham Residents Association
15/02/10/
- ANEMOMETER MAST DECISION
The Inspector has granted planning
permission for the anemometer at Docking. To read a copy of the Inspector’s
Decision Letter, please click here .
15/06/09 – FRING ANEMOMETER MAST
The
Borough Council refused planning permission for the anemometer mast and the
applicant launched an immediate appeal.
The closing date
for further submissions to the Planning Inspectorate is 18/09/09 and a decision
is awaited. It has since emerged that
the wind farm will be for seven turbines, each of 2MW. Each turbine will be 126 metres (409 feet)
high, with a blade diameter of 92 metres (299 feet).
27/04/09 – FRING ANEMOMETER MAST
The
madness continues ! A planning
application has been submitted for an anemometer mast at Fring. This is the first stage of the planning
process for yet another local wind farm.
The maps on the planning application are useless, but if you draw a
triangle from Bircham to Docking and back to Fring, the site is more or less in
the middle of that triangle. The
location of the site may seen on this aerial view ,
albeit that the red blob shown is somewhat larger than the actual diameter of
the mast and it’s guy wires (80 metres).
Details of the planning application are on the Borough
web site.
To join our group
please print an Application Form